TITLE 3 TAXATION
CHAPTER 13 BUSINESS TAX CREDITS
PART 19 RENEWABLE ENERGY PRODUCTION TAX CREDIT
3.13.19.1 ISSUING
AGENCY: Energy, Minerals and Natural
Resources Department.
[3.13.19.1 NMAC - N,
3-15-03]
3.13.19.2 SCOPE: This
part applies to the application and certification procedures for administration
of the renewable energy production tax credit.
[3.13.19.2 NMAC - N,
3-15-03]
3.13.19.3 STATUTORY
AUTHORITY: These rules are established under the
authority of NMSA 1978, Sections 7-2A-19 and 9-1-5E.
[3.13.19.3 NMAC - N,
3-15-03; A, 03-31-06]
3.13.19.4 DURATION:
Permanent.
[3.13.19.4 NMAC - N,
3-15-03]
3.13.19.5 EFFECTIVE DATE: March
15, 2003 unless a later date is cited at the end of a section.
[3.13.19.5 NMAC - N,
3-15-03]
3.13.19.6 OBJECTIVE: This
part’s objective is to establish procedures for administering the renewable energy
production tax credit.
[3.13.19.6 NMAC - N,
3-15-03; A, 03-31-06]
3.13.19.7 DEFINITIONS:
A. “Applicant” means a business entity that holds title to a
qualifying energy generator or leases property upon which a qualified energy
generator operates from a county or municipality pursuant to an industrial
revenue bond, or plans to develop a qualified energy generator and will hold
title to the qualified energy generator or lease property upon which the
qualified energy generator operates from a county or municipality pursuant to
an industrial revenue bond at the time the division certifies that the facility
is a qualified energy generator, and that applies to receive the renewable
energy production tax credit pursuant to this part for itself or on other taxpayers’
behalf.
B. “Biomass” means agricultural or animal waste; thinnings from trees less than 15 inches in diameter; slash
and brush; lumber mill or sawmill residues; and salt cedar and other phreatophytes removed from watersheds or river basins;
C. “Confidential information” means information included in
the renewable energy production tax credit application package or that the
department requires the applicant to submit as part of the approval process
that the applicant requests in writing to be held confidential.
D. “Department” means the energy, minerals and natural
resources department.
E. “Director” means the director or head of the
department’s energy conservation and management division.
F. “Division” means the department’s energy conservation
and management division.
G. “Five percent ownership” means New Mexico corporate
income taxpayers that individually or collectively, directly or indirectly, own
at least five percent of a qualified energy generator or of the total
capitalized cost to construct a qualified energy generator; and are entitled to
receive at least five percent of cash distributed to owners of the qualified
energy generator over its useful life.
H. “Generating capacity” means a qualified energy
generator’s nominal rated electrical power output (nameplate capacity) in
megawatts during optimum resource conditions, as the generator’s manufacturer
specifies. Generating capacity shall be
at least 10 megawatts. If the prevailing
resource conditions at a project site are insufficient for a qualified energy
generator to attain full nameplate capacity output at the time the division
issues the certification, the power output shall be that which corresponds to
at least 10 megawatts nominal rating according to the equipment manufacturer’s
published performance ratings for those prevailing conditions.
I. “Interconnection agreement” means an agreement allowing
the applicant to interconnect the qualified energy generator, of a specified
type and size, to a suitable electric transmission or distribution line.
J. “Land rights agreement” means an agreement providing the
applicant with control of land and the rights necessary to construct and
operate a qualified energy generator.
K. “Notice of allocation” means a form the division
prescribes that an applicant completes indicating the allocation of its or
another entity’s right to claim the tax credit to one or more taxpayers and
each taxpayer’s interest in the qualified energy generator.
L. “Power purchase agreement” means an agreement that binds
an applicant to provide power at a specified price and a buyer to purchase
power from the qualified energy generator.
M. “Project finance agreement” means an agreement that binds
a capable entity to provide the financing necessary for a qualified energy
generator’s construction.
N. “Qualified energy generator” means a facility with at
least 10 megawatts generating capacity located in New Mexico that produces
electricity using a qualified energy resource and that sells electricity to an
unrelated person.
O. “Qualified energy resource” means a resource that
generates electrical energy by means of a fluidized bed technology or similar
low-emissions technology or a zero-emissions generation technology that has
substantial long-term production potential and that uses only the following
energy sources: solar light, solar heat,
wind, or biomass.
P. “Renewable energy production tax credit application
package” or “application package” means the application documents submitted by
an applicant to the division for certification to receive the renewable energy
production tax credit.
Q. “Secretary” means the head of the department.
R. “Tax credit” means the renewable energy production tax
credit.
S. “Unrelated person” means a person who is not a partner
or joint venture participant who owns more than 50 percent of the profit
interest or capital interest in the partnership or joint venture; shareholder
who owns more than 50 percent of the shares, subsidiary, or parent company; or
a trade or business that is under common control. If a corporation is a member of an affiliated
group of corporations filing a consolidated tax return, the division will treat
the corporation as selling electricity to an unrelated person if another member
of the affiliated group sells the electricity to the person.
[3.13.19.7 NMAC - N,
3-15-03; A, 1-15-04; A, 03-31-06]
3.13.19.8 GENERAL
PROVISIONS:
A. Only those taxpayers that meet the requirements of
3.13.19.14 NMAC are eligible for a tax credit.
B. A proposed project shall meet these required
milestones. If a project fails to meet a
milestone, the division shall reject the application.
(1) Applicant submits a complete renewable
energy production tax credit application package to the division.
(2)
Construction of a qualified energy generator shall commence within 12
months of the application’s approval.
The applicant shall meet this requirement by entering into a
construction contract and by the placement of a permanent, physical part of the
facility, such as a poured concrete foundation.
Applicant shall submit to the division a copy of the contract
accompanied by a letter certifying that such construction has occurred.
(3) A qualified energy generator shall generate
electrical power and achieve commercial operation, demonstrating at least 10
megawatts generating capacity, within 24 months of the division’s approval of
the application.
(4) Within 24 months of the application’s
approval, the applicant shall submit to the division:
(a) the name of the
qualified energy generator;
(b) electric output
meter readings documenting commercial operation and indicating at least 10 megawatts
output;
(c) a copy of the bill of sale or other
documentation sufficient to evidence a sale of the power indicating the amount
of electrical energy produced, precise time period of production, and the name
of the buyer of the electricity; and
(d) records to verify
that the applicant is selling to unrelated persons.
C. NMSA 1978, Section 7-2A-19
limits the power production of a qualified energy generator eligible for a tax
credit to 400,000 megawatt-hours per year.
It also limits the eligible power production of all qualified energy
generators to 2,000,000 megawatt-hours per year. When the 2,000,000 megawatt-hours limit is
reached based on the total of applications approved, the division will no
longer approve applications, but will accept them for future consideration in
the event that approved facilities are not completed on schedule and tax credit
becomes available. The division shall
keep a record of the order of receipt of all applications.
[3.13.19.8 NMAC - N,
3-15-03; A, 1-15-04; A, 03-31-06]
3.13.19.9 APPLICATION:
A. A renewable energy production tax credit application form
can be obtained from the division.
B. An applicant shall submit an application package to the
division.
C. The application package shall consist of a completed
renewable energy production tax credit application form, with the following
required attachments:
(1) a copy of the
land rights agreement;
(2) a copy of the
interconnection agreement or a system impact study agreement between the
applicant and the interconnect utility, or its functional equivalent; and
(3) a copy of the
power purchase agreement, project finance agreement, or evidence of
self-financing.
D. The division shall return an incomplete application to
the applicant.
[3.13.19.9 NMAC - N,
3-15-03; A, 03-31-06]
3.13.19.10 APPLICATION
REVIEW PROCESS:
A. The division shall consider applications in the order
received, according to the day it receives them, but not the time of day. The division shall give applications it
receives on the same day equal consideration.
If the division approves applications it received on the same day and
they would exceed the overall limit of tax credit availability, then the
division shall divide the available credit among those applications on a
prorated, per megawatt-hour basis.
B. The division shall approve or reject an application
within 30 days following its receipt of the application package, or if the
division requires more time it shall notify the applicant of the reason and
shall approve or reject the application as soon as possible.
C. The division shall review the application package to
determine if the proposed generator will be a qualified energy generator and if
the requisite documentation specified in Subsection C of 3.13.19.9 NMAC, above,
is valid.
D. The division shall check the accuracy of the applicant’s
estimated annual production potential and make any necessary adjustments to
ensure the potential is reasonably achievable.
The limit of the qualified energy generator’s energy production eligible
for the tax credit for the taxable year shall be the lesser of: the estimate the division approves, or
400,000 megawatt-hours, or the eligible electricity remaining of the 2,000,000
megawatt-hours total for the state.
E. If the division finds that the application package meets
the required criteria and tax credit is available, the division shall approve
the application. The division shall
approve the application by issuing a letter to the applicant, which shall
include the limit of the qualified energy generator’s annual production
eligible for the tax credit.
F. The division shall reject an application that is not
complete or correct, does not meet the criteria for approval or fails to meet a
required milestone. The division’s
rejection letter shall state the reasons why it rejected the application. The applicant may resubmit the application
package for the rejected project. The
division shall place the resubmitted application in the review schedule as if
it were a new project.
[3.13.19.10 NMAC -
N, 3-15-03; A, 1-15-04; A, 03-31-06]
3.13.19.11 CONFIDENTIALITY
REQUESTS, WAIVERS, REVIEWS AND APPEALS:
A. An applicant may request in writing that the department
hold materials submitted as part of the application package and certification
process confidential pursuant to NMSA 1978, Section
71-2-8. The applicant shall address the
request to the director.
B. An applicant may request in writing that the director
waive any provision of the application unless NMSA
1978, Section 7-2A-19 requires the provision.
The applicant shall address the request to the director, and include the
facts and circumstances that support a waiver.
C. The applicant shall have the right to request in writing
review of the director’s decision to reject an application or review of the
division’s adjustments to the annual production estimate. The applicant shall address the request to the
director and include the reasons that the director should review the decision.
D. Any person having an interest that the request does or
may adversely affect may oppose an applicant’s request to hold materials an
applicant has submitted as part of an application package confidential or the
director grant an applicant’s request to waive a provision of the
application. The person shall submit the
opposition in writing, within 10 days of the request, to the director and send
a copy to the applicant. The opposition
shall include the reasons that the department should not hold the information
confidential or that the director should not grant the waiver.
(1) The director shall consider the request
and the opposition, if any. The director
may hold a hearing and appoint a hearing officer to conduct the hearing. The director shall send a final decision to
the applicant and any person or entity opposing the request within 20 days
after receiving the request, the opposition, if the request if opposed, or the date the hearing is held.
(2) The applicant or the person or entity
opposing the request may appeal in writing to the secretary a director’s
decision. The notice of appeal shall
include the reasons that the secretary should overturn the director’s decision.
E. The secretary shall consider any appeal from a
director’s decision. The applicant must
file the appeal and the reasons for with the secretary within 10 working days
of the director’s issuance of his decision.
The secretary may hold a hearing and appoint a hearing officer to
conduct the hearing. The secretary shall
send a final decision to the appellant within 20 days after receiving the
request or the date the hearing concludes.
[3.13.19.11 NMAC -
N, 3-15-03; A, 03-31-06]
3.13.19.12 CERTIFICATION:
A. When a qualified energy generator, for which the division
has approved a tax credit application package, produces power and it is sold to
an unrelated person, then the applicant may request certification from the
division. If the applicant is different
from the original applicant then the new applicant shall submit a revised
application form to the division indicating who is eligible for the tax credit. The qualified energy generator must
demonstrate at least 10 megawatts generating capacity. The applicant shall submit:
(1) the name of the
qualified energy generator;
(2) electric power
output meter readings indicating at least 10 megawatts generating capacity;
(3) a copy of the bill of sale or equivalent
documentation indicating the amount of electrical energy the qualified energy
generator produced, precise time period of production, and the name and
relationship, if any, of the buyer of the electricity; and
(4) a notice of
allocation indicating the allocation of the right to claim the tax credit and
evidence of each taxpayers’ ownership interest.
B. For purposes of monitoring the applicant’s compliance
with this part, the division or its authorized representative shall have the
right to visit a qualified energy generator upon giving the applicant five days
notice.
C. If the division finds that a qualified energy generator,
for which it has approved an application package, meets this part’s criteria,
the division shall issue a certificate to the applicant stating that the
facility is an eligible qualified energy generator, the facility’s estimated
annual production potential and the limit of that facility’s energy production
eligible for the tax credit.
[3.13.19.12 NMAC -
N, 3-15-03; A, 1-15-04; A, 03-31-06]
3.13.19.13 CLAIMING
THE TAX CREDIT:
A. To claim the renewable energy production tax credit, a
taxpayer shall submit to the New Mexico taxation and revenue department the
certificate the department issued to the applicant stating that the facility is
an eligible qualified energy generator, a copy of the certificate the
department issued to the taxpayer showing the taxpayer’s right to claim all or
a portion of the tax credit, documentation showing the taxpayer’s ownership
interest in the qualified energy generator, documentation of the amount of
energy the qualified energy generator produced in the taxable year, and any
other information the taxation and revenue department may require to determine
the amount of the credit due to each taxpayer claiming the credit.
B. If the amount of tax credit the taxpayer claims exceeds
the taxpayer’s corporate income tax liability, the taxpayer may carry the
excess forward for up to five consecutive taxable years.
C. Once the department has certified a facility as a
qualified energy generator eligible for the tax credit taxpayers retain the
original date of application for tax credits for that facility until either the
qualified energy generator is out of production for more than six consecutive
months in a year or until the qualified energy generator’s 10-year eligibility
has expired.
[3.13.19.13 NMAC -
N, 3-15-03; A, 03-31-06]
3.13.19.14 ALLOCATION
OF TAX CREDIT:
A. A business entity may allocate a taxpayer all or a
portion of the right to claim a tax credit without regard to proportional
ownership if:
(1) the taxpayer owns
an interest in a business entity that is taxed for federal income tax purposes
as a partnership;
(2) the business entity (a) is the applicant;
(b) owns an interest in the business entity, the applicant, that is also taxed
for federal income tax purposes as a partnership; or (c) owns, through one or more
intermediate business entities that are each taxed for federal income tax
purposes as a partnership, an interest in a business entity, the applicant, as
described in (b); and
(3) the taxpayer and all other taxpayers a
business entity allocates a right to claim the renewable energy production tax
credit pursuant to this section collectively have at least a five percent
ownership interest in the applicant's qualified energy generator; collective
ownership means that a business entity, which may be a partnership or have
subsidiary business entities, owns at least a five percent interest in the
qualified energy generator; a business entity that owns at least a five percent
interest in the qualified energy generator may receive the right to all of a
tax credit, but shall only allocate that right to its subsidiaries or partners
based upon their actual ownership interest in the business entity; for example,
the business entity owning the five percent interest is a partnership comprised
of three business entities; one business entity owns a 40 percent interest in
the business and the other two business entities each own a 30 percent
interest; 90 percent of the tax credit is allocated to the business entity that
owns a five percent interest in the qualified energy generator; the partner
owning 40 percent is entitled to 36 percent of the total tax credit and the
other two partners are each entitled to 27 percent of the total tax credit.
B. In order to allocate all or a portion of the right to
claim a renewable energy production tax credit, a business entity shall notify
the applicant of its allocation. The
applicant shall then compile each business entity’s allocation and submit the
notice of the allocation with documentation of each taxpayer's ownership
interest to the department on forms the department provides.
C. Upon receiving the notice of allocation from the
applicant, the department shall promptly certify the allocation in writing to
the applicant and any taxpayer receiving the allocation if the taxpayer meets
the criteria in Subsection A of 3.13.19.14 NMAC. A taxpayer receiving an allocation shall be
entitled to claim all such tax credit allocated to it that was generated during
the tax year.
D. If ownership of a business entity that has been allocated
a right to claim all or a portion of the right to claim a tax credit changes,
the replacement owner shall be entitled to claim the tax credit. The applicant may submit a revised notice of
allocation only once in a calendar year and in no event later than December 31
of the calendar year for the revised allocation.
[3.13.19.14 NMAC -
N, 03-31-06]
3.13.19.15 DETERMINATION
OF WHETHER A GENERATOR IS A SEPARATE FACILITY: When
determining whether a generator is a separate facility or is one of several
generators located in the same geographical location (e.g. mesa, section of
land) that comprise a single facility, the division shall consider the
following factors that indicate whether or not the generators are operated as
separate facilities. The division shall
consider factors such as whether the same corporate entity holds title to or
leases property from a county or municipality pursuant to an industrial revenue
bond where the generating infrastructure is located; whether the same buyer is
purchasing the electricity the generators produce; whether the generators have
different interconnection agreements or system impact study agreements; whether
the generators have different power purchase or project finance agreements;
whether the generator is connected with other generators before entering the
main transmission line; and any other factor the director deems relevant to the
determination.
[3.13.19.15 NMAC -
N, 03-31-06]
HISTORY OF
3.13.19 NMAC:
Pre-NMAC History: None.
History of Repealed
Material: [RESERVED]